Case Study

How GCE kept a fab's delicate 3-inch InP process on legacy KLA CD-SEM tools, avoiding a costly 300mm tool footprint

KLA 8250 CD-SEM
Compound-semiconductor IDM
01

The Challenge

The customer was evaluating new versus refurbished KLA 8250 CD-SEM solutions for a specialized InP process line. New tools carried high pricing and a lead time of over a year. The tools also needed to be reconfigured to support new materials and tighter process tolerances, against an aggressive delivery timeline. Wafer substrate was indium phosphide — brittle and requiring gentle handling — at a 3-inch wafer size, small enough that it fell well outside what most modern CD-SEM tooling is built to demo or support without reconfiguration. Buying new equipment would have also meant a forced transition to 300mm-native tooling, adding cost and cleanroom footprint the customer didn't want to take on for a niche process.

02

The Solution

GCE offered a full turnkey solution: sourcing 4+ suitable KLA CD-SEM systems from its own inventory, then performing full refurbishment, reconfiguration, installation, training, and warranty coverage, delivered within three months. Because the systems came from GCE's existing legacy-tool inventory — already sized natively for small-wafer handling — rather than a new tool with a down-converted 300mm tool footprint, the customer avoided both the added cost and the extra cleanroom floor space a new tool would have required.

03

GCE’s Involvement

GCE's differentiator here was substrate flexibility, not just inventory depth. The team keeps lab tools on standby at all times for customer demos across substrate types and sizes up to 200mm, so validating a request as unusual as a brittle, 3-inch InP wafer wasn't a special case — it was well within the range GCE already tests for. On-site, GCE's field engineers handled installation and reconfiguration of each system's wafer-handling components to safely support the smaller, more fragile substrate before releasing tools to production.

04

Results

GCE delivered the turnkey KLA CD-SEM solution within the planned three-month window, letting the customer keep their brittle 3-inch InP process running on familiar, already-qualified tooling. By avoiding a new tool's 300mm tool footprint and the down-conversion it would have required, the customer sidestepped both the added capital cost and the 50%-plus extra cleanroom floor space a new tool would have demanded — on top of the direct savings from buying refurbished.

3
months
Order to fab-ready installation delivered
$7M+
Capital cost saved
70%
Pricing below the new-tool price

A U.S. compound-semi IDM needed KLA 8250 CD-SEM tools reconfigured for a brittle 3-inch InP process, and GCE delivered a turnkey refurbished solution in three months instead of the year a new tool would take.

05

In their words

"We weren't just looking for a cheaper tool — we needed someone who actually understood how to handle a substrate this small and this fragile. Avoiding a forced move to 300mm alone made this worth it."

Fab Operations Lead
Compound-Semiconductor IDM, United States
06

Related

Similar projects

Related case studies

Connect

Have a project? Tell us what you need.

Tell us the tool, the wafer size, and your timeline — we'll tell you straight what's possible. And you can watch a system run to spec before you commit.

Rather talk it through first? Discuss a Similar Project — no obligation.